Airbus Industries

airbus1

 

Airbus Industries, Cheshire
Contractor: Birse Construction Ltd
Structural engineer: Haltec

Everdure Caltite System concrete used in the drainage gulley, collection sump and wash down pit to hanger 89.

Highways & Transport | Midlands