completed 2024

Lost Shore Resort, 
Edinburgh

A 23,000 m² surf lagoon development where the system was used throughout all areas of the bathymetry slab and walls, allowing the removal of the previously specified polyurea coating.

Contractor: WH Malcolm

Engineer: Ramage Young Partnership

Products used: Everdure Caltite ( 9029m³)