completed 2015
Bulmershe Leisure Centre,
Woodley Reading
Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab and retaining walls containing the swimming pool, learner pool, and two tanks, ensuring durable, waterproof concrete construction at all joints, penetrations, and interfaces.
Architect: Robert Limbrick Architects
Contractor: Pellikaan Construction Ltd
Engineer: AMA Consulting
Products Used: Caltite (578m³)