Royal Grammar School
Imperial College, London
Architect: MHB Design
Contractor: Beard, CW
Structural engineer: David Osborne Associates
Everdure Caltite System concrete used in the basement slab and retaining walls
of the new sports hall and underground rifle range and the rifle range roof.
Educational Establishment